Status Summary Report
(UPDATED 01-02-06)


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 200500-1-52-01 T1063 01/06/2005 $218,736  1
TOTAL : $218,736  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 219451-1-52-01 54 21637 01/07/2004 $1,776,793  1
TOTAL : $1,776,793  1


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 194196-1-52-01 21143 01/12/2005 $7,011,027  1
03 217999-1-52-01 46 T3039 01/12/2005 $980,825  1
03 222595-1-52-01 553200000 21085 01/12/2005 $5,631,642  1
TOTAL : $13,623,494  3


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 207350-3-52-01 T2036 01/20/2005 $94,148  1
TOTAL : $94,148  1


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 194071-2-52-01 T1050 01/20/2005 $1,206,560  1
06 411803-1-52-01 T6042 01/25/2005 $950,936  1
TOTAL : $2,157,496  2


CONSTRUCTION COMPLETE JOB IN RESIDENT OFFICE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
04 231916-1-52-01 932203503 20948 01/31/2005 $62,746,714  1
TOTAL : $62,746,714  1


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
06 406804-1-52-01 T6016 02/01/2005 $3,257,658  1
TOTAL : $3,257,658  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 409010-1-52-01 53 T3132 02/02/2005 $705,279  1
TOTAL : $705,279  1


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 408461-1-52-01 T1008 02/02/2005 $7,293,109  2
TOTAL : $7,293,109  2


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 403789-1-52-01 54 T3044 02/02/2005 $398,251  1
01 408184-1-52-01 T1029 02/02/2005 $1,662,309  2
TOTAL : $2,060,560  3


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 258734-1-52-01 20445 02/03/2003 $30,566,459  3
04 229092-1-52-01 932103515 20877 02/05/2004 $22,987,345  1
01 194008-1-52-01 21318 02/09/2004 $5,568,609  1
TOTAL : $59,122,413  5


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 404044-1-52-01 T1019 02/11/2005 $4,463,018  1
01 406757-1-52-01 T1046 02/11/2005 $578,735  1
TOTAL : $5,041,753  2


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 201009-2-52-01 T1001 02/11/2005 $4,235,824  2
TOTAL : $4,235,824  2


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 196898-1-52-01 T1020 02/16/2004 $1,903,231  4
01 195813-2-52-01 T1070 02/16/2005 $643,159  1
03 403790-1-52-01 50 T3005 02/16/2005 $907,339  1
TOTAL : $3,453,729  6


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 238679-1-52-01 360703501 20605 02/19/2004 $11,937,477  2
07 258734-2-52-01 T7050 02/21/2005 $540,681  1
TOTAL : $12,478,158  3


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 194036-2-52-01 21657 02/22/2005 $3,594,136  1
TOTAL : $3,594,136  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 257178-1-52-01 20503538 18988 02/25/1999 $9,116,831  2
TOTAL : $9,116,831  2


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 193791-1-52-01 21046 02/25/2004 $8,676,190  2
TOTAL : $8,676,190  2


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 255844-3-52-01 T7048 02/25/2005 $794,516  1
TOTAL : $794,516  1


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 408875-1-52-01 50 T3045 03/01/2005 $889,515  1
TOTAL : $889,515  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 218945-1-52-01 50 21514 03/02/2004 $1,463,503  1
TOTAL : $1,463,503  1


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 409015-1-52-01 50 T3047 03/02/2005 $765,641  1
TOTAL : $765,641  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 408876-1-52-01 580000000 T3019 03/03/2005 $3,347,680  1
TOTAL : $3,347,680  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 254805-1-52-01 20358 03/05/2004 $22,138,252  4
TOTAL : $22,138,252  4


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 197308-2-52-01 T1068 03/10/2005 $862,149  1
TOTAL : $862,149  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 218639-1-52-01 48 21057 03/14/2005 $26,301,803  1
TOTAL : $26,301,803  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 405274-1-52-01 55 T3025 03/14/2005 $666,803  2
07 413581-1-52-01 T7035 03/14/2005 $58,789  1
01 197168-1-52-01 21541 03/15/2005 $10,177,390  1
01 193821-1-52-01 20146 03/16/2005 $3,007,758  2
05 238635-1-52-01 361003522 20443 03/18/2003 $17,578,755  2
TOTAL : $31,489,495  8


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 194020-2-52-01 T1023 03/23/2005 $2,156,198  1
TOTAL : $2,156,198  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 218678-1-52-01 48 T3014 03/24/2005 $3,057,474  1
01 194172-2-52-01 T1051 03/24/2005 $2,215,948  1
TOTAL : $5,273,422  2


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 404631-1-52-01 T2049 03/24/2005 $2,351,226  1
02 207668-1-52-01 260703553 19575M 03/29/2000 $5,213,252  1
TOTAL : $7,564,478  2


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 218639-2-52-01 48 T3149 03/30/2005 $108,377  1
01 193829-1-52-01 T1010 04/03/2005 $767,075  1
02 207795-1-52-01 262203907 19670 04/09/1998 $91,155  2
01 197395-1-52-01 21580 04/11/2005 $10,250,751  1
01 195396-1-52-01 T1044 04/11/2005 $4,300,197  1
TOTAL : $15,517,555  6


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 258460-1-52-01 101903428 19126E 04/18/2000 $41,746,600  2
03 217998-1-52-01 46 21664 04/19/2004 $4,179,131  1
TOTAL : $45,925,731  3


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 239670-1-52-02 920900000 20208E 04/26/2002 $26,275,920  5
TOTAL : $26,275,920  5


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 197685-1-52-01 0 21176E 04/27/2004 $175,056  1
TOTAL : $175,056  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 201263-2-52-01 T1040 04/30/2005 $5,601,338  1
01 410642-1-52-01 T1076 04/30/2005 $463,602  1
05 240229-1-52-01 77040 T5055 05/06/2005 $1,602,325  1
TOTAL : $7,667,265  3


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 210803-2-52-01 T2088 05/11/2005 $242,479  1
TOTAL : $242,479  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 219777-1-52-01 55 T3007 05/12/2005 $7,771,402  2
TOTAL : $7,771,402  2


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 197703-2-52-01 T1017 05/13/2005 $901,357  1
TOTAL : $901,357  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 405250-1-52-01 T1038 05/19/2005 $5,560,593  1
TOTAL : $5,560,593  1


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 197700-1-52-01 T1037 05/20/2005 $1,360,439  1
TOTAL : $1,360,439  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 193823-1-52-01 21450 05/21/2004 $1,497,430  1
TOTAL : $1,497,430  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
04 229885-1-52-01 93060 T4040 05/25/2005 $3,924,329  2
TOTAL : $3,924,329  2


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 198637-1-52-01 21508 05/26/2004 $2,043,117  1
TOTAL : $2,043,117  1


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
06 411800-1-52-01 T6041 05/27/2005 $224,094  1
TOTAL : $224,094  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 220239-2-52-01 57 21585 06/01/2005 $1,013,734  1
08 242496-1-52-01 21268 06/02/2004 $13,979,760  1
02 207915-2-52-01 21606 06/02/2004 $1,986,357  2
03 218668-1-52-01 48 T3006 06/02/2004 $4,320,112  1
03 403923-1-52-01 53 21680 06/03/2004 $2,334,680  1
TOTAL : $23,634,643  6


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 193812-1-52-01 T1036 06/03/2005 $1,731,077  1
01 197270-2-52-01 T1054 06/03/2005 $1,418,757  1
01 197691-1-52-01 16020 T1043 06/03/2005 $1,151,885  1
TOTAL : $4,301,719  3


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 256830-1-52-01 21462 06/09/2005 $5,448,582  3
TOTAL : $5,448,582  3


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 220642-1-52-01 600203520 20944 06/11/2004 $23,320,601  3
TOTAL : $23,320,601  3


CONSTRUCTION COMPLETE JOB IN RESIDENT OFFICE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 411736-1-52-01 T1042 06/13/2005 $128,540  1
TOTAL : $128,540  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 217997-1-52-01 46 T3001 06/13/2005 $5,457,023  1
TOTAL : $5,457,023  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 406324-1-52-01 53 T3037 06/15/2005 $1,783,947  1
TOTAL : $1,783,947  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 196058-1-52-01 20973 06/17/2004 $9,724,623  2
01 194510-1-52-01 21145 06/17/2004 $7,034,217  2
TOTAL : $16,758,840  4


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 409009-1-52-01 48 T3131 06/21/2005 $411,827  1
TOTAL : $411,827  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
04 231727-1-52-01 86095 T4027 06/21/2005 $3,448,592  1
TOTAL : $3,448,592  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 411787-1-52-01 75035 T5054 06/22/2005 $450,583  1
02 209412-2-52-01 21607 06/22/2005 $2,189,800  1
08 258907-1-52-01 0 20225 06/27/2002 $33,134,366  1
05 237458-1-52-01 70050 21420 06/28/2005 $25,477,362  10
TOTAL : $61,252,111  13


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 240167-1-52-01 77170 21447 06/29/2005 $20,141,519  8
TOTAL : $20,141,519  8


HOLDING FOR ADDITIONAL INFORMATION
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 213265-1-52-01 19426 07/01/2003 $102,539,152  2
TOTAL : $102,539,152  2


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 409093-1-52-01 75080 T5061 07/05/2005 $530,599  1
TOTAL : $530,599  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 237503-1-52-01 700203501 20949 07/06/2004 $16,525,256  3
TOTAL : $16,525,256  3


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 239292-1-52-01 751403502 21459 07/06/2005 $19,284,028  6
05 240805-3-52-01 79070 21560 07/08/2005 $10,787,746  7
TOTAL : $30,071,774  13


CONSTRUCTION COMPLETE JOB IN RESIDENT OFFICE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 237550-1-52-01 70020 21485 07/10/2005 $9,990,412  8
TOTAL : $9,990,412  8


FINAL PLANS RECEIVED CHECKING NOT STARTED
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 411864-1-52-01 T1066 07/16/2005 $1,228,027  1
TOTAL : $1,228,027  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 197507-2-52-01 T1077 07/18/2005 $1,232,990  1
01 194436-2-52-01 T1061 07/18/2005 $4,035,664  2
01 415560-1-52-01 T1105 07/18/2005 $50,501  1
01 408469-1-52-01 T1086 07/18/2005 $1,371,045  1
TOTAL : $6,690,200  5


FINAL PLANS RECEIVED CHECKING NOT STARTED
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 193957-2-52-01 T1060 07/19/2005 $2,807,546  3
TOTAL : $2,807,546  3


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 209714-2-52-01 T2007 07/22/2004 $2,329,690  1
TOTAL : $2,329,690  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 198027-1-52-01 21453 07/23/2005 $34,718,971  8
TOTAL : $34,718,971  8


BACK CHECKING RESUMED
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 411951-1-52-01 T1087 07/28/2005 $539,467  1
TOTAL : $539,467  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 409173-1-52-01 92060 T5025 08/02/2005 $6,036,333  5
TOTAL : $6,036,333  5


FINAL PLANS RECEIVED CHECKING NOT STARTED
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 415561-1-52-01 T1104 08/03/2005 $217,918  1
TOTAL : $217,918  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
04 230619-1-52-01 86 T4014 08/03/2005 $5,676,340  1
TOTAL : $5,676,340  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 211576-2-52-01 T2040 08/03/2005 $558,357  1
TOTAL : $558,357  1


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 406747-1-52-01 T1067 08/04/2005 $2,640,823  1
01 409233-1-52-01 T1034 08/04/2005 $454,603  1
01 197669-2-52-01 T1056 08/04/2005 $548,954  1
01 195902-2-52-01 T1059 08/04/2005 $1,224,296  5
TOTAL : $4,868,676  8


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
04 228223-1-52-01 86070 T4023 08/04/2005 $2,858,425  1
TOTAL : $2,858,425  1


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 198553-1-52-01 21581 08/08/2005 $5,858,020  3
TOTAL : $5,858,020  3


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 220655-1-52-01 600603511 20015 08/09/2002 $6,292,937  1
07 405756-2-52-01 21647 08/10/2004 $12,341,878  2
TOTAL : $18,634,815  3


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 411384-1-52-01 46 T3146 08/10/2005 $4,242,738  1
03 217948-2-52-01 46 T3018 08/10/2005 $9,228,427  1
TOTAL : $13,471,165  2


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
04 228038-1-52-01 860903535 T4022 08/11/2005 $3,125,483  1
TOTAL : $3,125,483  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 193912-1-52-01 21576 08/11/2005 $2,099,113  2
TOTAL : $2,099,113  2


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 218487-1-52-01 482800000 20840 08/12/2003 $10,204,628  1
TOTAL : $10,204,628  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
04 403591-1-52-01 89 T4065 08/15/2005 $393,259  1
TOTAL : $393,259  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 207667-1-52-01 260803522 20267 08/19/2002 $6,701,153  1
08 258907-2-52-01 0 21342 08/22/2003 $794,650  1
TOTAL : $7,495,803  2


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 410416-1-52-01 51 T3143 08/22/2005 $1,137,866  1
TOTAL : $1,137,866  1


FINAL PLANS RECEIVED CHECKING NOT STARTED
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 209168-1-52-01 21443 08/22/2005 $27,375,080  1
TOTAL : $27,375,080  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 413473-1-52-01 18010 T5086 08/23/2005 $280,315  1
TOTAL : $280,315  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 258870-1-52-01 21246 08/24/2005 $33,532,552  1
05 238740-1-52-01 360600000 T5007 08/25/2004 $3,524,798  3
TOTAL : $37,057,350  4


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 197697-1-52-01 T1026 08/26/2004 $2,431,816  1
TOTAL : $2,431,816  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 406253-1-52-01 T7032 08/26/2005 $2,669,457  1
03 220387-1-52-01 580013414 20680 08/27/2003 $15,271,940  4
TOTAL : $17,941,397  5


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 209570-1-52-01 720403905 19713E 08/28/1998 $745,024  1
TOTAL : $745,024  1


FINAL PLANS RECEIVED CHECKING NOT STARTED
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 413828-1-52-01 T1097 08/29/2005 $352,398  1
TOTAL : $352,398  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 403810-1-52-01 51 T3050 08/29/2005 $1,100,095  1
TOTAL : $1,100,095  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 257103-1-52-01 T7009 08/31/2005 $3,021,252  3
TOTAL : $3,021,252  3


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 406321-1-52-01 48 T3122 09/01/2005 $940,252  1
TOTAL : $940,252  1


CONSTRUCTION COMPLETE JOB IN RESIDENT OFFICE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 198005-1-52-01 20934 09/01/2005 $30,483,486  6
TOTAL : $30,483,486  6


FINAL PLANS RECEIVED CHECKING NOT STARTED
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 404087-1-52-01 T1031 09/02/2005 $2,450,708  1
TOTAL : $2,450,708  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 413390-1-52-01 T7030 09/02/2005 $1,482,167  2
TOTAL : $1,482,167  2


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 403931-1-52-01 54 T3027 09/07/2005 $5,589,057  1
03 403929-1-52-01 49 T3032 09/07/2005 $3,592,983  1
TOTAL : $9,182,040  2


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 242696-1-52-01 79002 T5032 09/07/2005 $22,225,520  8
04 227462-1-52-01 860153503 T4017 09/07/2005 $11,634,889  1
TOTAL : $33,860,409  9


FINAL PLANS RECEIVED CHECKING NOT STARTED
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 197027-1-52-01 16260 21690 09/07/2005 $15,018,369  1
TOTAL : $15,018,369  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 219165-1-52-01 52 21665 09/08/2004 $5,014,033  1
TOTAL : $5,014,033  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 406191-1-52-01 T7055 09/08/2005 $733,945  1
TOTAL : $733,945  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 219884-1-52-01 55 T3022 09/12/2005 $3,159,571  3
03 408053-1-52-01 48 T3026 09/13/2004 $607,335  1
TOTAL : $3,766,906  4


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 406332-1-52-01 52 T3127 09/13/2005 $920,626  1
08 258886-1-52-01 0 20224 09/16/2002 $17,656,710  2
TOTAL : $18,577,336  3


FINAL PLANS RECEIVED CHECKING NOT STARTED
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 195693-1-52-01 21578 09/16/2005 $10,307,537  1
TOTAL : $10,307,537  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 416378-5-52-01 61 T3186 09/19/2005 $322,927  1
TOTAL : $322,927  1


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 237925-1-52-01 73020 T5048 09/20/2005 $7,559,921  3
TOTAL : $7,559,921  3


CONSTRUCTION COMPLETE JOB IN RESIDENT OFFICE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 198091-5-52-01 T1106 09/20/2005 $629,400  1
TOTAL : $629,400  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 210454-1-52-01 T2114 09/20/2005 $1,774,399  1
TOTAL : $1,774,399  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 197576-1-52-01 21475 09/21/2004 $11,370,115  2
03 220512-1-52-01 59 21667 09/21/2004 $2,927,456  1
TOTAL : $14,297,571  3


FINAL PLANS RECEIVED CHECKING NOT STARTED
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 406756-1-52-01 T1080 09/22/2005 $1,861,980  1
01 197767-2-52-01 T1062 09/22/2005 $2,354,048  1
01 406755-1-52-01 T1052 09/23/2005 $3,549,250  1
TOTAL : $7,765,278  3


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
06 414834-1-52-01 T6036 09/27/2004 $256,434  1
TOTAL : $256,434  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 218003-1-52-01 46 T3011 09/27/2005 $11,537,913  1
TOTAL : $11,537,913  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 409234-1-52-01 T1053 09/27/2005 $467,758  1
03 409019-1-52-01 57 T3137 09/27/2005 $764,469  1
04 231731-1-52-01 86070 T4024 09/28/2005 $12,409,187  1
TOTAL : $13,641,414  3


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 239718-1-52-01 21264 09/29/2004 $7,738,824  2
04 230108-1-52-01 940703505 21458 09/30/2005 $13,649,129  2
TOTAL : $21,387,953  4


CONSTRUCTION COMPLETE JOB IN RESIDENT OFFICE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 409189-1-52-01 T1111 09/30/2005 $275,370  1
TOTAL : $275,370  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 257101-1-52-01 T7005 10/01/2004 $10,746,032  3
TOTAL : $10,746,032  3


CONSTRUCTION COMPLETE JOB IN RESIDENT OFFICE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 415570-1-52-01 T1131 10/01/2005 $157,550  1
TOTAL : $157,550  1


HOLDING FOR ADDITIONAL INFORMATION
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 210409-1-52-01 T2019 10/03/2005 $12,467,017  1
02 208182-6-52-01 T2111 10/03/2005 $91,000  1
TOTAL : $12,558,017  2


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 209713-2-52-01 T2022 10/06/2005 $2,787,132  1
02 209697-3-52-01 T2070 10/07/2005 $459,783  1
TOTAL : $3,246,915  2


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 411730-1-52-01 75060 T5051 10/10/2005 $1,562,142  2
TOTAL : $1,562,142  2


FINAL PLANS BEING FRONT CHECKED
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
04 229771-1-52-01 930013512 21211 10/11/2005 $30,855,032  1
TOTAL : $30,855,032  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 406325-1-52-01 53 T3123 10/11/2005 $1,558,318  1
TOTAL : $1,558,318  1


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 219162-1-52-01 520503500 21011 10/11/2005 $2,743,898  1
03 403924-1-52-01 53 21646 10/11/2005 $1,246,414  1
01 197007-2-52-01 T1071 10/12/2005 $1,027,396  1
TOTAL : $5,017,708  3


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 411387-1-52-01 48 T3147 10/12/2005 $1,655,522  1
06 250200-1-52-01 T6018 10/14/2005 $9,146,384  3
TOTAL : $10,801,906  4


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
06 412760-1-52-01 T6040 10/14/2005 $362,820  1
TOTAL : $362,820  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 410188-1-52-01 T7051 10/14/2005 $1,814,167  2
TOTAL : $1,814,167  2


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 211377-1-52-01 21455 10/16/2003 $3,070,018  1
TOTAL : $3,070,018  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 208116-4-52-01 T2106 10/17/2005 $766,477  1
01 197574-1-52-01 T1033 10/19/2004 $2,067,534  1
TOTAL : $2,834,011  2


HOLDING FOR ADDITIONAL INFORMATION
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 210669-2-52-01 T2008 10/27/2004 $6,144,704  1
TOTAL : $6,144,704  1


PAIDOFF JOBS
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 409103-1-52-01 92030 T5042 10/28/2005 $1,850,861  4
TOTAL : $1,850,861  4


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 411613-1-52-01 11140 T5084 10/31/2005 $1,755,914  1
TOTAL : $1,755,914  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 403741-1-52-01 T7054 10/31/2005 $9,642,016  1
TOTAL : $9,642,016  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 406620-1-52-01 48 T3130 11/01/2005 $1,438,048  1
02 210936-2-52-01 T2110 11/03/2005 $699,937  1
TOTAL : $2,137,985  2


PAIDOFF JOBS
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
06 407738-1-52-01 T6046 11/03/2005 $1,682,869  1
05 413601-1-52-01 75012 T5075 11/03/2005 $592,370  1
TOTAL : $2,275,239  2


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 209265-1-52-01 T2009 11/03/2005 $3,227,087  1
TOTAL : $3,227,087  1


FINAL PLANS BEING FRONT CHECKED
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
06 249783-1-52-01 T6021 11/03/2005 $12,942,034  5
TOTAL : $12,942,034  5


FINAL PLANS RECEIVED CHECKING NOT STARTED
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 258880-1-52-01 T7044 11/04/2005 $7,110,846  1
02 209697-2-52-01 T2083 11/04/2005 $2,860,582  1
TOTAL : $9,971,428  2


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 413006-1-52-01 T7078 11/04/2005 $70,800  1
05 411983-1-52-01 36001 T5068 11/04/2005 $2,794,325  1
06 414760-1-52-01 T6039 11/07/2005 $746,354  1
TOTAL : $3,611,479  3


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 258412-1-52-01 20805 11/08/2005 $19,400,608  1
TOTAL : $19,400,608  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 219748-1-52-01 55 T3020 11/08/2005 $16,135,970  1
TOTAL : $16,135,970  1


PAIDOFF JOBS
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 411993-1-52-01 11200 T5058 11/09/2005 $2,985,122  2
TOTAL : $2,985,122  2


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
04 228852-1-52-01 89060 T4054 11/09/2005 $2,958,399  1
TOTAL : $2,958,399  1


PAIDOFF JOBS
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 409005-1-52-01 55 T3010 11/09/2005 $141,148  1
07 257163-1-52-01 21563 11/09/2005 $14,780,502  3
02 207662-3-52-01 T2064 11/09/2005 $5,712,417  2
TOTAL : $20,634,067  6


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 258663-1-52-01 T7019 11/09/2005 $15,300,184  2
TOTAL : $15,300,184  2


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 207785-2-52-01 T2058 11/09/2005 $6,212,795  4
TOTAL : $6,212,795  4


HOLDING FOR ADDITIONAL INFORMATION
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 209528-3-52-01 T2057 11/10/2005 $8,343,449  2
TOTAL : $8,343,449  2


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
04 231878-1-52-01 932203465 20788 11/10/2005 $112,473,366  1
TOTAL : $112,473,366  1


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
06 410645-1-52-01 T6075 11/10/2005 $1,971,855  1
TOTAL : $1,971,855  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 255734-1-52-01 21274 11/10/2005 $22,870,803  3
TOTAL : $22,870,803  3


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 221757-1-52-01 54 T3012 11/10/2005 $2,653,914  1
TOTAL : $2,653,914  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 220506-1-52-01 59 T3057 11/10/2005 $1,280,570  2
TOTAL : $1,280,570  2


PAIDOFF JOBS
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 211524-1-52-01 T2032 11/14/2005 $1,017,691  1
02 210288-2-52-01 T2066 11/15/2005 $7,505,141  1
08 258956-1-52-01 971403322 20104 11/15/2005 $34,863,814  2
TOTAL : $43,386,646  4


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 210004-1-52-01 21583 11/15/2005 $15,064,251  1
06 411798-2-52-01 T6076 11/15/2005 $687,589  2
TOTAL : $15,751,840  3


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
06 407759-1-52-01 T6032 11/15/2005 $8,286,438  4
TOTAL : $8,286,438  4


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 403932-1-52-01 56 T3024 11/17/2004 $758,839  1
TOTAL : $758,839  1


CONSTRUCTION COMPLETE JOB IN RESIDENT OFFICE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 413950-1-52-01 11040 T5100 11/17/2005 $522,803  1
TOTAL : $522,803  1


PAIDOFF JOBS
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 407100-1-52-01 70004 T5002 11/17/2005 $745,569  1
TOTAL : $745,569  1


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
06 412759-1-52-01 T6035 11/18/2005 $247,796  1
TOTAL : $247,796  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 209642-2-52-01 T2030 11/18/2005 $3,497,182  1
TOTAL : $3,497,182  1


FINAL PLANS RECEIVED CHECKING NOT STARTED
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 209692-2-52-01 T2082 11/18/2005 $3,906,415  1
TOTAL : $3,906,415  1


PAIDOFF JOBS
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
04 228034-1-52-01 860103506 T4012 11/18/2005 $4,153,780  1
04 403585-1-52-01 86010 T4013 11/18/2005 $2,324,570  1
TOTAL : $6,478,350  2


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
02 210378-2-52-01 T2085 11/18/2005 $2,742,047  1
02 210223-4-52-01 T2084 11/18/2005 $4,603,261  1
TOTAL : $7,345,308  2


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 413578-1-52-01 75030 T5073 11/21/2005 $1,597,265  1
TOTAL : $1,597,265  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 222633-1-52-01 53 T3059 11/21/2005 $443,821  1
TOTAL : $443,821  1


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 198087-4-52-01 T1057 11/21/2005 $2,228,032  1
TOTAL : $2,228,032  1


PAIDOFF JOBS
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 413575-1-52-01 11130 T5079 11/21/2005 $2,679,264  1
TOTAL : $2,679,264  1


CONSTRUCTION COMPLETE JOB IN RESIDENT OFFICE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 413474-1-52-01 11010 T5089 11/23/2005 $590,595  1
TOTAL : $590,595  1


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
08 258949-1-52-01 20890 11/28/2005 $902,898  3
01 197774-2-52-01 T1013 11/29/2004 $874,670  1
01 404035-1-52-01 T1007 11/29/2004 $1,242,401  1
TOTAL : $3,019,969  5


PAIDOFF JOBS
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
05 240758-1-52-01 791903515 21266 11/29/2005 $16,335,515  5
05 240757-1-52-01 791903514 21265 11/29/2005 $15,267,320  4
TOTAL : $31,602,835  9


FINAL ESTIMATE HAS BEEN SUBMITTED TO CONTR. FOR THEIR REVEW AND ACCEPTANCE
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
07 411277-1-52-01 T7065 11/30/2005 $1,806,585  1
TOTAL : $1,806,585  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 218683-1-52-01 48 T3002 12/01/2003 $1,298,487  3
03 219717-1-52-01 550033518 19205 12/06/2002 $17,073,000  4
03 222444-1-52-01 482600000 20945 12/06/2004 $10,320,246  1
TOTAL : $28,691,733  8


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 195893-2-52-01 T1015 12/10/2004 $1,844,919  1
TOTAL : $1,844,919  1


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
03 219870-1-52-01 55 21638 12/14/2004 $3,602,622  2
TOTAL : $3,602,622  2


FISCAL HAS BEEN ADVISED TO PAY/CLOSE CONTRACT
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 194514-1-52-01 T1014 12/17/2004 $3,388,806  1
01 197334-2-52-01 T1021 12/21/2004 $2,125,248  2
01 197152-2-52-01 T1025 12/28/2004 $970,618  1
TOTAL : $6,484,672  4


CONTRACTOR SUBMITTED QUALIFIED ACCEPTANCE LETTER/ESTIMATE SENT TO COMPTROLLER
DISTRICT  FPN PROJECT CONTRACT EDATE DOLLARS # Jobs
01 404373-1-52-01 T1028 12/28/2004 $576,914  1
TOTAL : $576,914  1
OVERALL TOTAL : $1,727,513,071  419



 