Budget Estimate Reports for February 29, 2012 FDOT Bid Letting


NO.Ad No.Proposal IDFPNNoteCOUNTYWORK-MIXAMOUNTDAYSDIST.

#1Ad #2T1485
Bid Items
422630 1 52 01LSLEESIDEWALK$1,201,639.00 1201
#2Ad #2T1490
Bid Items
425346 1 52 01**/LSPOLKSIDEWALK$198,264.00 451
#3Ad #2T1491
Bid Items
429238 1 52 01**/LSSARASOTASIDEWALK$231,369.00 601
#4Ad #2T1492
Bid Items
429502 1 52 01**/LSHIGHLANDSLIGHTING$202,767.00 801
#5T3357
Bid Items
422890 1 52 01ETCHOLMESBRIDGE REPLACEMENT$647,621.00 1653
#6Moved from 1/25/12T3375
Bid Items
421243 1 52 01ETC/FSSANTA ROSABRIDGE REPLACEMENT$18,096,542.00 11943
#7Ad #2T3376
Bid Items
424609 1 52 01LEONRESURFACING$9,000,000.00 2543
#8Ad #2T3381
Bid Items
421640 1 52 01ETCBAYRESURFACING$5,825,148.00 2203
#9Ad #2T6257
Bid Items
425145 1 52 01ETCMIAMI-DADERESURFACING / INTERSECTION IMPROVEMENT$7,311,300.00 3006
#10Moved from 1/25/12T6273
Bid Items
250080 3 52 01MIAMI-DADELANDSCAPING$1,148,565.00 2006
#11Ad #2T7300
Bid Items
424051 1 52 01PINELLASFLEXIBLE PAVEMENT RECONSTRUCT$1,468,240.00 1707

TOTAL BUDGET ESTIMATE =$45,331,455.00

ETC = (More than one project no. within the contract)
* = Jobs $150,000 or Less
** = Jobs $250,000 or Less

A+B A+B Bidding Project LS Lump Sum Bidding QC2000 QC2000 Pilot Project
LR Lane Rental Project P Partnering I-D Incentive/Disincentive
BAM Bid Averaging Method GC General Contractor LSB Liquidated Savings
M Metric MS Mandatory Start OCIP Owner Controlled Ins. Program
EA Early Award QP2 Lead Based Paint W Warranty
BB Bonus Bidding SS Special Start ASB Asbestos Abatement
UU Underground Utilities ASBS As-Built Survey PB Push Button
SO Specs Only % Electronic Plans LP Landscaping Prequalification
LSIC Lump Sum Innovative Contracting MPC Mandatory Prebid Conference # $300 Job (Plan/Spec or Proposal)



 